How To Install Osb Siding
Consult your local building code for requirements in your geographic area.
How to install osb siding. The caveat when using a nail gun is to set the depth of the nail so the head just. To install the furring strips start by cutting them to size so they run from one end of the surface to the other. Refer to important notes for more information on water resistive barriers. They need to run in the opposite direction of the metal siding.
Lap siding also called horizontal siding or clapboard may be made of wood fiber cement plywood hardboard or similar materials. Then nail them to the surface you re working on leaving 16 inches 41 cm between each strip. If the result is a whole number you re in. But if the result is not a whole number you will need to cut the final piece of siding lengthwise in order to fill in.
Divide the length of each wall by 8 inches the width of a piece of siding. If you have to cut the last row of siding you ll. A hammer and 8d nails are standard for installing osb but you can speed up the installation by using a nail gun. Unless already installed a water resistive barrier should be applied to the house prior to installing vinyl siding.
Lay sheets in rows with the long edge horizontal to the roof bottom. Make sure you install the furring strips horizontally and not vertically. Provide a 1 8 inch gap. The minimum osb panel size is 24 inches in any direction and each sheet end must rest on a rafter.