How To Install Roof Drip Edge Flashing
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of the plywood and.
How to install roof drip edge flashing. Slide the corner tight to the fascia. The roof leg should extend a minimum of 2 back onto the roof sheathing. Make sure to support the long end of the cut if you let it fall after cutting it will bend down and kink the drip edge. Place a nail at one end then the other.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first. How to install drip edge and step flashing 1. Be sure to tuck the drip edge under the starter strip and felt paper. Regardless of how you layer the drip edge and roofing underlayment drip edge needs to be nailed into sheathing using standard roofing nails.
Start the installation at the lower edge of the roof and work your way up toward the peak. While the vertical leg should be placed 1 4 1 2 away from the fascia. How to install drip edge flashing to a new roof. Along the rake edges of a roof install underlayment before applying drip edge.
You may need to nail through the starter strip into the drip edge. Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge. How to install drip edge flashing on a roof step 1. Tack the edge in place with a roofing nail every foot or so.
Lift the shingles and slide the top flange of the drip edge underneath. Underlayment along the eaves will overlap the top of the drip edge. Add the drip edge while it may be a common practice to install drip edge tight to the fascia silva advocates for a. Space nails every 12 in.
Start with the ice barrier in climate zones prone to ice damming code requires that a self adhering ice barrier.