How To Install Starter Roofing
Snap horizontal chalklines to help you keep the courses straight.
How to install starter roofing. Gaf pro series starter strip shingles valley hip install. Quick installation tips for how to install gaf starter strip shingles on a roof. Use four roofing nails per shingle as indicated on package instructions six nails in high wind areas. If you live in an area with inclement weather you should consider using a special ice and water protector.
Drill starter holes if needed then scew down the vent with the fasteners in the installation kit. The adhesive on the starter course seals the tabs of the first full course. The end should overhang over the edge about 1 4 to 3 4 of an inch. Place the cover over the vent opening and screw into place.
Using four roofing nails or up to six in high wind areas secure the starter shingle to the surface of the roof. Install new flashing metal. Then move into the attic and apply to the underside of the opening and vent. Whether installed at the eave or the rake the starter shingles should overhang the edge of the roof by inch to inch.
Continuing with the starter shingles. Apply a second layer of sealant around the lip of the vent outside. Butt the edges together instead of overlapping them. Do not penetrate the shingles with the hammer.
Install a starter strip. Before peeling the shingle starter strip trim about 4 inches off an end of the first starter strip and align the strip to the area you are planning to stick it on. Overlap each row at least 3 to 4 inches. After the first shingle has been placed on the roof set the second starter shingle next to it.
You will want the roof granular side up when applying the strip. Start by laying asphalt felt or other underlayment over the roof. Finally nail the first course of shingles directly on top of and flush with the starter course. If possible have the shingles delivered via a boom directly onto the roof.
Where do the nails go. Typically the finish shingles are then installed to align with the edge of the starters. Detailed installation of starter strip shingles at the valleys and hips.