How To Install Tectum Roof Panels
Beginning at the outside edge of your roof place each panel directly onto the purlins that are attached to the roof trusses.
How to install tectum roof panels. Tectum iii tectum iiip composite roof deck solution with good sound absorption r values up to 44 and high humidity application performance. Tectum iii e ns roof deck tectum composite panels tectum iii e and ns use a code recognized sheathing 7 16 osb as the top surface. Screw the new panel in place as described. Do not use fasteners that are long enough to fully penetrate the tectum.
The silicone will spread and adhere creating a seal. Continue adding panels until the roof is covered. Tectum e tectum e n. Now you can install 1 thick tectum on trusses and i beams for added acoustics while maintaining an exposed structure visual on the deck.
The platform needs to be covered with a moisture resistant material before the deck is stacked on the platform. From a natural factory finish or white to made to order sherwin williams colors tectum panels can coordinate or complement your color palette with the sizes shapes and forms that make your designs happen. Standard roofing nails are used for attachment of shingles to these panels. Cover the deck with water shedding material and secure.
Roof deck wall ceiling panels when noise control durability matter. Tectum panels are living product imperative certified by the international living future institute 1 panels in white and natural only. To install corrugated roofing start by cutting your panels to length with an angle grinder. Shingles can be attached with nails appropriate for the applied sheathing.
Toughness and acoustics are at the heart of tectum interior products ideally suited to open spaces and high traffic high impact areas. Tectum roof deck should be unloaded and stored on the site on a stacking platform. The platform is to be raised at least six inches from the ground or floor level. Tectum v composite roof deck solution with good sound absorption r values up to 36 for long span applications up to 12 feet.
Metal roofing should be installed over tectum using self drilling self tapping screws of similar metal and of sufficient length to go well into the tectum. No additional sheathing is required. Install the panel so that the short lip overlaps the large lip. Prior to starting roof installation ensure that suitable pull out resistance can be obtained using the desired fastener.
You may need to cut panels to fit angles using a circular saw with a metal saw blade.