How To Lay 3 Tab Roofing Shingles
A chalk line will need to be popped going down the middle of the roof from the bottom to the top.
How to lay 3 tab roofing shingles. Bring a trash can up on the roof so you have a place to throw old shingles and flashing. Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps. Also place a nail 2 inches from each end of the shingle in line with the other two. Many pros shingle in a vertical line up the roof because it s much faster.
Lastly multiply this number by 3 and you will know how many packs you need to buy. Video 8 install lp smart side panels part 1. Lay more shingles on the sides of the roof so that they overlap the start shingles. Video 14 how to install an entrance door.
Video 13 installing 3 tab roofing shingles. However make sure that you do not nail into the tar strip. From there you will need to lay down the start line for your shingles. Attach and align shingles to attach a 3 tab shingle align it with the layout line and drive nails 1 2 inch above the cutout slots including the half slots at each side.
Installing asphalt roof shingles can be aggravating after some work is done and then the rows don t work out. Video 12 install lp smart side panels part 2. Each shingle will require around 4 nails underneath the tar line and about half an inch under where the next shingle will overlap. Whenever you are laying shingles it is always a good idea to go to the middle of the roof along the edge to begin with.
Divide that number by 100 to get the correct number of squares. Tools you will need for roofing from amazon bostitch coil nailer https amzn to 2u1v8e2 shingle remover https amzn to 2fzu5wf roof snake https amzn to 2. Video 9 build install soffit ladders. Place nails in the three tab shingles about 3 4 inch 1 8 centimeters above the cutouts near where the tab meets the upper part of the shingle.
In all use four nails per 3 tab shingle. Video 10 install roof sheathing. If you are using a power nailer drive nails by squeezing the trigger and bouncing the nailer s tip onto the shingle. Next remove old shingles and flashing.
The first row of shingles should overhang the drip edge of the roof. Around an inch should do. Drive a nail at one end first then drive the others. This video focuses on laying 3 tab shingles on.