How To Lay A Pro Panel Roofing
For this example it s exactly 24 inches and i m going to add an inch and a half to that measurement and cut my panel to length.
How to lay a pro panel roofing. Add the metal panels. 6 transition trim place trim over outside closure. 9 roofing panel install with lower edge 1 above the transition bend. Measure one panel width in from the roof edge.
Fasten using panel wood screws. The roof panels will not withstand the weight of a person standing at the edge of the panel. The application and detail drawings in this manual are strictly for illustration purposes and may not be appli. This guide is supplied by fabral inc.
Contact building regulators to determine the requirements for. Place the first screw. Do not stand on the roof panel until the panels have been attached. 10 panel wood screw space according to the recommended fastening pattern and local codes.
For use by its customers and is intended to be a guide only. Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm. Place the leading edge of the first panel along this line. Pro panel ii install guide.
To watch the entire series from the beginning click here. Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof. 5 rib roofing panels must be applied on a minimum roof pitch of 2 12 or greater. Take measurements from the roof peak to the eave for custom cut premium pro snap panels.
It is extremely important that this panel be laid square to the eave and ridge so that the remaining panels will line up square on the roof frame. This does not replace local or state building codes. Put your tape up against the end wall and measure down to the edge of your eave trim. How to install premium pro snap roofing step 1.
8 inside closure install along the length of the transition trim about 2 above the bend. Take care the first piece is aligned precisely perpendicular square to the edge. To do so flip the panel over and make marks on the reverse side. Install the roofing screws vertically along each rib in the panel.
Use a scaffold for easy access to the roof. Always begin working at the point with the longest peak to eave distance. Be sure the larger edge is laid so that the small edge of the next panel will overlap it.