Once all the underlayment is applied go back and place.
How to properly install roof drip edge. Make sure the outer edge extends over the gutter. Drip edge should be installed on the edge of the roof and should be directed straight down so water can easily be directed into the chute for water. Using a utility knife cut back the front end of the drip edge. The roof leg should extend a minimum of 2 back onto the roof sheathing.
Wrap this around the edge of the eave. The drip edge is nailed in place using 1 1 2 galvanized roofing nails. The cutback drip edge will have a bit of an overhang. It is used for mounting on the gable overhang.
Install roof drip edge along the eaves add underlayment then place drip. Slide the corner tight to the fascia. Secure the drip edge with roofing cement. Place a nail at one end then the other.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle. On the rakes the drip edge goes over the membrane so the roofers apply the membrane first. If it doesn t pull the drip edge out slightly from under the shingles. It fits perfectly for installation on the eaves.
On the eaves the peel and stick goes over the drip edge though there is some argument in the industry as whether this is the best way to install drip edge. To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first. A wrapped flap like this is needed to ensure that the drip edge provides comprehensive coverage leaving no room for the water to seep into the roof decking. How to install a drip edge.
Place the metal roof drip edge flashing along the gable ends. How to fix a roof drip edge installing roof drip edge flashing properly. Be sure to tuck the drip edge under the starter strip and felt paper. Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.