How To Install New Roofing Shingles
Step 7 install the ridge shingles.
How to install new roofing shingles. Complete the application of underlayment and valley flashing before the roofing shingles are applied. Using the chalk line snap a line between the two marks to get a straight edge. Do the hips in the same manner with the ridge shingles overlapping the hips at the joints. The recommended flashing material is a 28 gauge galvanized metal or an equivalent corrosion resistant non staining material check with local codes.
Center a 914 mm 36 width strip of an ice and water protector membrane in the valley. Pull the drip edge down about a half inch from that line to create a gap between the drip edge and the fascia board. Once you ve done that cut your shingles to size if they re not already. Then begin nailing the shingles to the roof working in rows and starting at the edge of the roof.
Repeat this on both sides of the roof. To install asphalt shingles start by installing underlayment and new flashing on the roof. To start installing shingles line up aluminum drip edge flush with the edge of the roof and make a pencil line at the top on each end of the house. Every 5 inches make a new mark until you get to the rop of the roof.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps. Many pros shingle in a vertical line up the roof because it s much faster. Use the chalk line to snap a straight line vertically every 6 inches.