How To Nail Cedar Shake Siding
Drive the staple flush with a hammer.
How to nail cedar shake siding. Use two fasteners to apply each certi label shingle or shake. When you hit a stud the staple may not sink in completely. Begin the installation by wrapping the house with a waterproof membrane either 15 to 30 pound felt or semi permeable house wrap. Step 4 choices of design.
Use galvanized nails or staples for most of the job but stainless steel nails are the best choice wherever the heads will show. Apply overlapping horizontal rows of building paper onto the shear wall using a staple gun with 3 8 inch staples. Apply both nails 3 4 inches from the edge of each shake or shingle and about 1 1 2 inches above the exposure line. How to install staggered cedar shake siding.
Go back and nail subsequent nails along the top edge of this cedar shake siding piece. Install the windows and door jambs so you can trim the doors windows and corners of the house with wood trim. Nails should be long enough to penetrate underlying materials in the cedar shingles at least 3 4 inches or all the way through. Each row overlaps the.
This is when each piece of cedar siding covers half of the one below it much like staggering and layering on cedar siding on top of one another to provide a scale like appearance. Both t g and bevelled siding gets a fastener 3 4 above the top of the board below. Bevel siding should be face nailed to studs with 1 1 4 inch penetration into solid wood using one nail per piece spaced at a maximum of 24 inches on center. Nails are used to secure each shake and spaced accordingly so that the next line of shakes will cover the preceding line.
Adjust the stapler so it drives the staples just flush and does not indent them. You can hand nail with galvanized casing nails but most builders use something like a bostich trim nailer for speed. Start at the bottom of the wall at one end. The idea is to avoid double nailing the board which will cause cracks when it shrinks.
Align the thick lower edge of a cedar shake at the lower edge. Where possible the bottom of the board that is placed across the top of the windows should coincide with the window cap.